Instructions for the operation of the automatic water fire extinguishing system. Brief instruction manual for installation of the Apples object Object procedure AUPP

Under the exploitation of fire automation installations, they understand their use to detect or extinguishing fires, as well as their maintenance and repair. When operating the AUP, an APS is made a set of activities that provide:

technically proper use installations, i.e. use when detecting or extinguishing a fire, in extinguishing mode;

proper storage;

timely and high-quality maintenance in order to maintain installation in good and efficient condition;

timely and high-quality repair;

The maintenance is understood as a complex of work, which ensures control of the technical condition, extension of the work resource. Maintenance activities are divided into four groups:

preparation of the installation to use after triggering or repair, which includes filling equipment (replacement of triggering or damaged sprinklers, etc.);

control of the technical condition;

prevention;

current repairs in order to maintain the reliability and durability of installations.

The control of the technical condition is carried out in order to evaluate the ability of the settings to perform the specified functions. This ability is estimated by the values \u200b\u200bof certain parameters. If the values \u200b\u200bof these parameters correspond to passport values, the installation is considered good.

In case of deviation from the norm - the installation is faulty, because It cannot provide satisfactory performance of the specified functions. Thus, control of the state of installations comes down to the preparation of true, i.e. Measured on the installation, values, parameters with their nominal values. As a result of the comparison, it is concluded about the technical condition of the installation and the possibility of its further use.

Maintenance is divided into daily, monthly, quarterly, and annual. With daily maintenance, the following work is performed:

monitoring the color of the painting of pipelines;

control over compliance permissible distances (no more than two meters) from irrigators to stored materials;

external inspection of control nodes (control and starting units, valves);

checking for pressure gauges over the control and starting node and under it (the difference should not exceed 0.05);

operation of pumps, compressor in accordance with instructions (passports) manufacturers. The results of the inspection for each item are recorded in the registration of "Operation of installations".

With monthly maintenance, daily maintenance is carried out, as well as perform the following operations:

inspection and preventive work related to electrical equipment of installations;

checking the voltage of the main and backup power sources, input to automatic switches, automatic switches in the alarm circuit;

checking the performance of electrical equipment in remote and automatic modes;

inspection and preventive work on all communications

checking pumps and its reinforcement, pressure - according to the testimony of pressure gauges;

checking control and starting devices.

Quarterly maintenance includes monthly maintenance operations, in addition, perform the following works:

checking the condition and fastening of the pipeline and rods;

verification of the work of the ECM on the control manometer;

turning the shafts of pumps manually pumps.

Annual includes events on quarterly maintenance and additionally to this:

testing for tightness check valves and valves;

checking and inspection of instrumentation in the deadlines specified in the factory instructions;

replacement or repair of worn parts;

selective testing of irrigation waters;

measuring the resistance of the ground loop.

In addition, there are types of maintenance work that must be fulfilled once every 3 years. These include:

operations for annual maintenance;

elimination of leaks in the system, repair of equipment fixtures;

tinning equipment;

repair of grounding devices;

measurement of insulation of the installation drive;

revision of pumps, shut-off valves;

flushing system.

Operating Instructions AUP.

General instructions

Acceptance of the AUP into operation should be carried out as part of the representatives:

energy Power Supplies (Chairman);

project, installation and applied organizations;

state fire supervision.

The program of work of the Commission and the act of acceptance must be approved by the main technical leader of the enterprise.

SECURITY MEASURES

When operating technological equipment Water Fire Extinguishing Personnel Energy Personnel Must comply with the relevant safety requirements specified in PTE, PTB, as well as in factory passports and instructions for use of specific equipment.

With maintenance and repair of the AUP, when visiting the premises, protected by AUP, the automatic control of the specific distribution pipeline of this direction should be translated into manual (remote) before exiting the room of the last person.

Cooking with water pipelines should be carried out only according to the approved program in which measures should be included, providing staff protection from a possible rupture of pipelines. It is necessary to ensure complete removal of air from pipelines. Combine work on crimping with other works in the same room is prohibited. If crimping is carried out by contracting organizations, then work is performed by tolerance. The implementation of these works by operational or repair personnel of the energy enterprise is issued by written orders.

Before the start of work, the staff employed by crimping should be instructed by safety in the workplace.

During the crimping in the room there should be no extraneous persons. Pressing should be carried out under the control of the responsible person.

Repair work on technological equipment should be carried out after taking pressure from this equipment and the preparation of the necessary organizational and technical measures established by the current PTB.

Preparation for work and verification of the technical condition

Fire extinguishing installations

Installation of foam fire extinguishing consists of:

source of flexibility (reservoir);

fire pumps (intended for the fence and supply of the solution into pressure pipelines);

suction pipelines (connecting the water source with fire pumps);

pressure pipelines (from the pump to the control node);

distribution pipelines (laid within the protected room);

control units installed at the end of pressure pipelines;

rods.

In addition to the above, based on design solutions, the fire extinguishing scheme may include:

a tank with a solution of a foaming agent for filling fire pumps;

pneumoBack to maintain constant pressure in the fire extinguishing network;

compressor for feeding the pneumatic air;

trigger cranes;

check valves;

dosage washers;

pressure switch;

manometers;

vacuum;

level gauges for measuring levels in tanks and pneumatic bodies;

other instruments of alarm, control and automation.

After graduation mounting work Suction, pressure and distribution pipelines must be washed and subjected to hydraulic tests. The results of washing and crimping should be decorated with acts.

If possible, check the effectiveness of the installation of fire extinguishing by organizing the extinguishing of an artificial focus of fire.

When washing pipelines, water should be supplied from ends to the direction of the control nodes (in order to prevent the clogging of pipes with a smaller diameter) at a speed of 15-20% more than a fire solution rate (determined by the calculation or recommendations of project organizations). Flushing should be continued to the steady appearance of pure water. If it is impossible to flush individual sections of pipelines, it is allowed to purge them dry, clean, compressed air or inert gas.

Hydraulic testing of pipelines must be carried out under a pressure of 1.25 worker (P), but not less p + 0.3 MPa, for 10 minutes.

To disable the test area from the rest of the network, you must install the deaf flanges or plugs. It is not allowed to use available control nodes for this purpose, repair valves, etc.

After 10 minutes, test pressure should be gradually reduced to the worker and make a thorough inspection of all welded connections and segments adjacent to them.

The network of pipelines is considered to be withstood hydraulic test if there are no signs of breaking, leaks and droplets in welded joints and on the main metal, visible residual deformations.

Measure pressure follows two pressure gauges.

Flushing and hydraulic tests of pipelines should be carried out under conditions that exclude their freezing.

It is forbidden to frish from open trenches with pipelines undergoing strong frosts, or a frustration of such trenches with fatty soil.

Automatic water fire extinguishing installations must operate in automatic start mode. For the period of stay in cable structures of personnel (bypass, repair work, etc.) Start of installations should be translated into manual (remote) inclusion.

Maintenance of fire extinguishing installations

Persons responsible for the operation, conducting the capital and current repair equipment of the fire extinguishing equipment, are appointed by the head of the energy enterprise, which also approves graphics of technical supervision and equipment repair.

The person responsible for the constant readiness of the fire extinguishing equipment technological equipment must know the principle of the device and the procedure for the operation of this equipment, as well as to have the following documentation:

project with changes made during installation and adjustment of fire extinguishing installation;

factory passports and operational instructions on equipment and devices;

this typery instruction and local instruction manual for process equipment;

acts and protocols of installation and commissioning, as well as testing of the operation of technological equipment;

play-schedules of maintenance and repair of technological equipment;

"Maintenance of maintenance and repair of fire extinguishing installation".

Any deviations from the accepted project project, replacing equipment, additional installation The irrigances or their replacement of irrigators with a large nozzle diameter must be previously agreed with the project institute - the author of the project.

To control the technical condition of technological equipment for fire extinguishing installation, a "log of maintenance and repairing installation of fire extinguishing installation should be conducted, in which the date and time of checking, who conducted the verification, detected faults, their nature and the time of their elimination, time of forced disabling and inclusion Fire extinguishing installations, conducted testing of the entire installation or individual equipment.

At least once a quarter with the content of the magazine should be met by receipt of the main technical leader of the enterprise.

To verify the readiness and effectiveness of AVP, once every three years, a complete revision of the technological equipment of this installation should be carried out.

During the revision, in addition to the main works, the pressure testing pipeline is carried out and flushing (or purge) and the crimping pipelines in the most aggressive medium (dampness, gas and dust) are carried out at two to three directions.

If deficiencies are found, it is necessary to develop activities that ensure full elimination of their deadlines.

Automatic fire extinguishing installation in accordance with the schedule approved by the head of the appropriate workshop, but at least once every three years should be tested (tested) on a specially developed program with a real launch of them to work, provided that it will not entail a stop of technological equipment or all production process. During testing in the first and last ripples, water pressure and irrigation intensity should be checked.

Testing should be carried out with a duration of 1.5-2 minutes with the inclusion of serviceable drainage devices.

According to the results of testing, the act or protocol must be drawn up, and the fact of testing is registered in the "Maintenance and repairing and repairing of fire extinguishing installation".

Checking the operation of AWP or individual types of equipment should be carried out during the output for repair, maintenance of the protected room and the technological installation.

To store spare equipment, equipment parts, as well as devices, tools, materials, appliances required for control and organization repair work AUVP, a special room must be allocated.

The technical capabilities of AWP should be made to the operational plan for extinguishing the fire in this energy enterprise. During the fire-fighting training, it is necessary to expand the range of personnel, which knows the purpose and the AVU device, as well as the order of bringing into action.

Personnel serving compressors and pneumatic boys AWP should be trained and certified in accordance with the requirements of the Gosgortkhnadzor Rules.

The person responsible for the operation of the technological equipment of the fire extinguishing installation should organize classes with personnel allocated to control the work and maintenance of this equipment.

In room pumping station AWPs should be posted: Instructions on the procedure for inclusion of pumps and opening of shut-off valves, as well as principled and technological schemes.

Pads to the building (room) of the pumping station and the installation of fire extinguishing, as well as approaches to pumps, pneumatic, compressor, control nodes, pressure gauges and other fire extinguishing equipment, should always be free.

The existing fire extinguishing installation must be sealing in the working position:

hatches of reservoirs and containers for storing water stocks;

control units, valves and hand-inclusion cranes;

pressure switch;

running taps.

After the fire extinguishing installation is triggered, its performance must be completely restored not after 24 hours.

Verification of the water level in the tank should be carried out daily with registration in the "Maintenance and Repair Maintenance and Repair Journal". If you decrease the water level due to evaporation, you need to add water if there are leaks to establish a damage to the tank and eliminate leaks.

The operation of the automatic level gauge in the tank must be checked at least once every three months at the plus temperature, monthly - when negative temperature And immediately in case of doubt in good operation of the level gauge.

The tanks must be closed to access unauthorized persons and sessured, the integrity of the seal is checked during the inspection of the equipment, but at least once a quarter.

Water in the reservoir should not contain mechanical impurities that can score pipelines, dosage washers and rods.

To prevent the rotation and flowering of water, it is recommended to disinfect with chlorine lime at the rate of 100 g of lime per 1 m of water.

Replacing the water in the tank is needed annually at the autumn time. When replacing water bottom and inner walls The tank is cleaned of dirt and growths, damaged color is restored or fully updated.

Prior to the start of frosts, the gaps between the lower and the top covers of the hatch must be filled with insulated material.

Once a quarter, the state of the inputs, shut-off valves, measuring instruments and a water intake well is checked.

Prior to the onset of frost, the valve in the water intake should be examined, if necessary, repaired, and the well was insulated.

Before testing the pumps, you need to check: tightening the glands; Lubrication level of bearings baths; correctness of the tightening of the foundation bolts, nuts cover of pumps and bearings; Connections of the pipeline on the suction side and the pumps themselves.

Once a month, pumps and other equipment of the pumping station should be seen, cleaned from dust and dirt.

Each fire pump is at least two times a month should be included to create the required pressure, which is recorded in the operational journal.

At least once a month should be checked the reliability of the transfer of all fire pumps to the main and reserve power supply With registration results in the operational journal.

If there is a special tank for the pump bay, the latter should be inspected annually and painted.

Once every three years, pumps and engines in accordance with clause 5.1.5 of this Typical instruction, There should be a revision, during which all available disadvantages are eliminated. The repair and replacement of the parts worked, checking the seals is carried out as needed.

Pumping station must be kept clean. In the absence of duty, it must be fixed on the lock. One of the spare keys should be stored on the control panel, which should be indicated on the doors.

Once a quarter must be checked:

lack of leaks and pipelines;

the presence of a constant slope (not less than 0.01 for pipes with a diameter of up to 50 mm and 0.005 for pipes with a diameter of 50 mm or more);

state of fixtures of pipelines;

lack of touches of electrical storage and cables;

coloring condition, no dirt and dust.

Detected disadvantages that may affect the reliability of the installation operation must be eliminated immediately.

The pressure pipe should be in constant readiness to action, i.e., filled with water and be under operating pressure.

For AUP transformers and cable facilities In the locking devices, steel reinforcement should be applied, electrified valves with automatic brand 30c 941nzh; 30C 986NG; 30C 996NZH with a working pressure of 1.6 MPa, repair valves with manual brand 30s 41nzh with a working pressure of 1.6 MPa.

The status of control nodes and shut-off reinforcement, the presence of a seal, pressure values \u200b\u200bbefore and after control nodes must be monitored at least once a month.

Once in the half year the check should be conducted electrical circuit The control of the control node with its automatic inclusion from the fire detector with a closed valve.

The location of the control unit should be well lit, the inscriptions on pipelines or special stencils (node \u200b\u200bnumber, protected area, the type of irriments and their number) must be made of implanted bright paint and look through well.

All damage to the valves, valves and check valves, which can affect the reliability of the operation of the fire extinguishing installation, must be eliminated immediately.

As water irrigances for automatic fire extinguishing transformers, ODDR-15 irrigances are used with the working pressure of the water in front of the irrigances in the range of 0.2-0.6 MPa; For the automatic fire extinguishing of cable structures, DV rods are used, DVM with a working pressure of 0.2-0.4 MPa.

When examining the equipment of distribution devices, but at least once a month, the rods must be examined and cleaned from dust and dirt. When a malfunction or corrosion is detected, measures should be taken to eliminate them.

When repairing repair work, the rods must be protected from plastering and paint (for example, polyethylene or paper caps, etc.). Detected after repair traces of paint and solution must be removed.

It is forbidden to install instead of defective jams and plugs.

To replace faulty or damaged rods, a reserve must be created 10-15% of the total number of installed rods.

The inclusion of the pneumatic to work should be carried out in the following sequence:

fill the pneumobac with water by approximately 50% of its volume (the level is controlled by water glass);

turn on the compressor or open the valve on the compressed air pipe;

pressure in the pneumobacker to raise to the worker (controlled by the pressure gauge), after which the pneumatic bodies connect to the pressure pipe, creating a working pressure in it.

Every day an external inspection of the pneumatic tube should be carried out, check the water level and air pressure in the pneumatic tube. With a decrease in air pressure by 0.05 MPa (with respect to the worker), its swap is produced.

Once a week, the compressor is tested on idling.

Maintenance of the pneumatic and compressor, held once a year, includes:

emptying, inspection and cleaning of the pneumatic;

removing and checking on the booth of the safety valve (with the malfunction to replace the new one);

color surface of the pneumatic (on the surface indicate the repair date);

detailed compressor inspection (replace worn parts and fittings);

implementation of all other technical requirements provided by factory passports and operating instructions Pneumatic and compressor.

Turning off the pneumatic from the fire extinguishing scheme is prohibited.

The inspection of the pneumatic bodies is made by a special commission with the participation of representatives of the State Mountain Supplies, the local bodies of the state fire supervision and this energy enterprise.

The correctness of the testimony of the work of the pressure gauges installed on the pneumators should be checked once a month mounted on pipelines - once in a half.

Full checking on the fire extinguishing installation of all pressure gauges with their sealing or branding should be made annually in accordance with the current position.

Organization and requirements for repair work

During the repair of technological equipment, fire extinguishing installation should be guided primarily to the requirements of the passport, the instructions for the operation of a specific equipment, the requirements of the relevant norms and technical conditions, as well as the requirements of this Instruction.

When replacing the pipeline section on bending, the minimum radius of the inner bend curve steel pipes There must be at least four outer diameters in a cold state in a cold state, in a hot condition - at least three.

On the curved part of the pipe should not be folds, cracks or other defects. Ovality in bending places is allowed no more than 10% (determined by the ratio of the difference between the greatest and smallest outer diameters of the curved tube to the outer diameter of the pipe to bend).

The difference and displacement of the edges of the jammed pipes and parts of the pipelines should not exceed 10% of the wall thickness and should be no more than 3 mm.

The edges of the welded pipe ends and the surface adjacent to them before welding must be cleaned of rust and dirt on a width of at least 20 mm.

The welding of each joint must be performed without interruptions until the entire joint is fully welding.

The welded joint of the pipes should be blown when the following defects are found:

cracks overlooking the surface of the seam or base metal in the welding zone;

slops or subsoring in the zone of transition from the base metal to the deposited;

burns;

the non-uniformity of the weld in width and height, as well as deviations from the axis.

In particularly raw rooms with a chemically active medium of the construction of pipelines, the steel profiles with a thickness of at least 4 mm should be performed. Pipelines and mounting structures should be covered with protective varnish or paint.

Compounds of pipelines with open gasket should be located outside the walls, partitions, overlaps and other building structures.

Fastening pipelines K. building structures The buildings should be made by normalized supports and suspensions. Welding pipelines directly to metal designs buildings and structures, as well as elements of technological equipment not allowed.

Welding supports and suspension to building structures should be carried out without weakening them mechanical strength. Chers and curvatures of pipelines are not allowed.

Each turn of the pipeline longer than 0.5 m should have a mount. The distance from the pendants to the welded and threaded joints of the pipes should be at least 100 mm.

The newly installed rods must be cleaned of preservative lubricants and verified. hydraulic pressure 1.25 MPa (12.5 kgf / cm2) for 1 min. Middle time Ripers are determined at least 10 years.

General provisions

The procedure for the operation and maintenance of automatic systems (installations) of fire extinguishing (AUP) is regulated by GOST, SNiP, PPB, departmental standards and rules, technical operational documentation for installation.
Responsibility for organizing the operation of the AUP is assigned to the managers of objects that are protected by the means of fire automation.
For each AUP, an order must be issued or an order for the enterprise (organization) appointing:
- the person responsible for the operation of the installation;
- Operational (duty) staff for round-the-clock control over the healthcare state of installations.

For each AUP for those responsible for the operation of the installation, and for the staff serving this installation, instructions for use should be developed, taking into account the specifics of the protected premises, approved by the management of the enterprise and coordinated with the organization that implements the R AUP.
The person responsible for the operation of the AUP should be in time to inform the local GPS bodies on the failures and the operation of the installations.
Operational (duty) personnel must have and fill out the installation logging log.
The enterprise that implements the repair of the AUP should have a license for installation, commissioning, repair and maintenance of equipment and fire protection systems.
It is allowed to carry out the s specialists of an object with appropriate qualifications. At the same time, the procedure for carrying out work on that and p must comply with the Methodological recommendations of VNIIPIP.

Restoring the performance of the AUP or ASPS after the operation of a triggering or failure should not exceed:
- for Moscow, St. Petersburg, administrative centers of autonomous formations in the composition Russian Federation - 6 h;
- for other cities and settlements - 18 h.

Between the operating organization and the enterprise that implements the R, must be concluded and operate "Agreement for maintenance and repair automatic installations fire extinguishing. "
In the dispatching point, there must be an instruction on the order of the duty dispatcher upon receipt of the alarm.
The adoption of AUP on the fact and P should precede the primary survey of the installation in order to determine the technical condition.
The primary survey of the AUP should be carried out by the Commission, which includes a representative of the GPN authorities.
According to the results of the survey, the AUP should be compiled "Act of the primary survey of automatic fire extinguishing installations" and "Act on the work performed on the primary survey of automatic fire extinguishing installations".

The installation adopted on both P, after the conclusion of the contract must be filled:
- automatic fire extinguishing passport;
- Log of registration of maintenance and repair of automatic fire extinguishing installations. It must contain all the works on that and p, including quality control. One copy of this journal should be kept by the person responsible for the operation of the installation, the second - in the organization, which implements the R. in the journal should also be noted to conduct a personnel safety briefing technique that is responsible for operating the installation. Pages of the journal must be numbered, laid and bonded by the seals of organizations serving AUP and carrying out TIR;
- schedule for maintenance and repair. The order and repair of the AUP, as well as the deadline for eliminating the failure, the installations must comply with the Methodical recommendations of VNIIPIP. The list and frequency of maintenance work must comply with the Type Rules of Maintenance of the AUP;

technical requirementsdefining the performance parameters of the AUU.

The company should include the following technical documentation:
- the act of primary survey of the AUP;
- Act on the work performed on the primary survey of the AUP;
- Agreement at that and p;
- schedule of this and p;
- technical requirements that determine the performance parameters of the AUP;
- List technical meansincluded in the AUP and subject to both p;
- call accounting log;
- Act technical examination AUP;
- Project on the AUP;
- passports, certificates for equipment and appliances;
- the statement of mounted equipment, nodes, instruments and automation means;
- Passports PA Charging cylinders of gas fire extinguishing installations;
- Instructions for the operation of the installation;
- Journal of registration of works on that and p;
- schedule of duty of operational (duty) personnel;
- the journal of acceptance of the reception of duty of operational personnel;
- Weighing magazine (control) cylinders with fire extinguishing composition of gas fire extinguishing installations.

All necessary documentation At the AUP (or photocopy) should be at the person responsible for the operation of the AUP.
With the external inspection of the AUP and the premises protected by it, it is necessary to check the compliance with the project:
- characteristics of the protected room and its fuel load;
- modifications of fire extinguishing rods, the method of their installation and placement;
- cleanliness of rods;
- pipelines of installations (no use of pipelines of fire extinguishing installations for suspension, attachment, attachment of equipment not related to the AUP);
- light and sound alarm system located in the dispatching paragraph;
- telephone connection of the dispatch point with fireguard Enterprises or settlements.

Features of checking fire extinguishing installations

Verification of water and foaming installations

When conducting a survey of the technical condition of water and foaming installations, guests can be guided by GOST R 50680, GOST R 50800, NPB 88-2001 and the requirements of Methodical recommendations of VNIIPIP.
During the survey of water and foaming installations, it should be monitored:
1. The state of the rods (in places where there is a danger of mechanical damage, the rods must be protected by reliable fences that do not affect the irrigation map and the propagation of thermal flows).
2. Strip sizes (within each distribution pipe (one section) rods must be installed irrigances with outlets of one diameter).
3. The content of the rods (must be constantly kept clean; during the period of carrying out and the protected room of repair work, the rods must be fenced from plastering. Paints and blots; After the repair of the room is completed, the protective devices must be removed).
4. The presence of the stock of the rods (should be at least 10% for each type of rods from the number of mounted on distribution pipelines, for their timely replacement during operation).
5. Protective covering Pipelines (indoors with a chemically active or aggressive medium, they must be protected by acid-resistant paint).
6. The presence of a functional setting of the control nodes (each node must be posted a functional pattern of the strapping, and in each direction - the plate indicating operating pressure, protected areas, tina and the number of rods in each section of the system, position (state) of shut-off elements in the duty mode).
7. The presence on tanks for storing the inviolable water supply for the purpose of fire extinguishing devices that exclude water consumption for other needs.
8. The presence of a reserve reserve of the foaming agent (100% reserve reserve of the foaming agent should be provided).
9. Ensuring the provision of a pumping station with a telephone connection with a dispatch point.
10. Availability at the entrance to the station pump station "Fire extinguishing station" and a constantly functioning light scoreboard with a similar inscription.
11. The presence of clearly and neatly performed strapping schemes of the pumping station and the fire extinguishing scheme of fire extinguishing scheme. All showing measuring instruments must have inscriptions about operating pressures and the permissible limits of their measurements.
12. Test time installation (testing of water and foaming installations during their operation should be carried out at least once every 5 years).

When operating, the AUP is prohibited:
- installed instead of shut-off or defective jackets and plugs, as well as install rippers with different, except for the design documentation, the castle melting temperature;
- to store the materials of a distance of less than 0.6 m from the rods;
- use fire extinguishing pipelines for suspension or fastening of any equipment;
- to attach production or plumbing equipment to nutritional pipelines of fire extinguishing installation;
- to install shut-off valves and flavian compounds on nutrient and distribution pipelines;
- use internal fire cranes installed on the sprinkler network, for other purposes, in addition to extinguishing a fire;
- Use compressors for purposes that are not associated with ensuring the installation of the installation.

Features of checking gas fire extinguishing installations

In the process of controlling UGP during operation, it is necessary:
- conduct an external inspection component parts installations for mechanical damage, dirt, fastening strength, presence of seals;
- to control the working position of the shut-off reinforcement in the motivation network and starting cylinders;
- Check the main and backup power supply, check the automatic power supply from working input to the backup;
- to monitor the number of response by weighing or controlling the pressure (for centralized in GP - the main and backup number of the response, for modular UGPs - the number of the respondents and the presence of its stock);
- to check the efficiency of the components of the installation (technological part, electrical part);
- check the performance of the installation in manual (remote) and automatic modes;
- check for the presence of metrological calibration of instrumentation;
- measure the resistance of the protective and working ground;
- measure the resistance of the insulation of electrical circuits;
- check the presence and validity period of the technical inspection of the components of the UGP under pressure.

Control and testing UGP should be carried out without the production of extinguishing composition according to the methods set out in GOST R 50969.
The mass control (pressure) of the state, gas pressure control in motivating cylinders should be carried out in the established TD on the UGP, with a mark in the journal. Requirements for state and gas-propellant applicable when refueling (podaching) UGP should be the same as when initial refueling.
Fire extinguishing stations must be equipped and contained in a state corresponding to design solutions.
If during the operation of the UGP, it happened or refusal, it should be restored by the health of UGP (refueling state, propellant gas, replacement of modules, pyropatrons in starting cylinders, distribution devices etc.) on time and made appropriate entries in the journal.
In the case of the use of the state from the stock of the UGP, it must be restored simultaneously with the restoration of UGP operation.

Features of inspection of aerosol fire extinguishing installations

When examining objects protected by AUP, it is necessary to monitor the observance of a number of regulatory requirements.
The requirements of the maintenance regulations on the UAP surveyed should be not lower than the requirements of the "Model Regulation of Technical Services of Aerosol Fire Extinguishing Installations".
If there is a mechanical damage in the installation site of Goa, they must be fenced.
Places of installation of Goa and their orientation in space must comply with the project.
On Goa must be seals or other devices confirming their integrity.
The combustible load of the premises protected by UAP, its leakage and geometric dimensions must comply with the project.
On the surface of Goa and in the exposure zone of high-temperature aerosol jet, combustible materials should not be.
Electric conduits designed to supply an electrical pulse to the Goa Starting device must be laid and protected from thermal and other effects in accordance with the project.
The stock of Goa must comply with the project.
There must be a good light and sound alarm in the protective room and in the room attendant.
There must be instructions for service personnellocated in a protective room, about actions when the aerosol fire extinguishing installation is triggered.

Features of checking modular powder fire extinguishing installations.

The list and frequency of maintenance work is determined in accordance with the regulations drawn up by the Maupte developer on the basis of technical documentation for components. The requirements of the maintenance regulations on a specific Muput should be not lower than the requirements of the standard maintenance regulations.


List of works

The frequency of maintenance service of the enterprise

Periodicity of maintenance by specialized enterprises

External inspection of component parts of the system (pipelines, sprayers, modules with powder, cylinders with compressed gas, pressure gauges, etc.; Electrotechnical part of electro-automatic cabinets, etc.; Signaling part of the receiving and control devices, detectors, etc. ) In the absence of mechanical damage, dirt, fastening strength, etc.

Daily

Monthly

Pressure control in modules and starting cylinders

Control of the main and backup power sources, checking automatic power switching from working input to the backup

Weekly

Quality control of fire extinguishing powder

In accordance with TD on the module

In accordance with TD on the module

Checking the performance of the component parts of the system (technological part, electrical part, alarm)

Monthly

Monthly

Preventive work

Checking the system performance in manual (local, remote) and automatic modes

At least twice a year

At least twice a year

Metrological test of kip

Annually

Annually

Measuring the resistance of the protective and working ground

The GPS bodies check the availability of records in the maintenance log of maintenance work and the current repair of Mauput in accordance with the regulations and checking the conduct of a pressure vessel passport (if necessary, according to PB 10-115).

Additionally, representatives of the GPS are carried out by an external inspection of Muput:
- availability of factory seals;
- the presence of displacing gas;
- Availability safety devices, according to the documentation for the module;
- the presence of module marking, as well as the compliance of the brand of the oath powder in the room in the room;
- the presence of devices from the spontaneous launch of Muput;
- the state of the linear portion of the signaling loop;
- Compliance of the laid electrical wiring, installed detectors. devices, boxes, etc. Project documentation.

Maintenance AUP. after commissioning, it should be carried out in the amount and time limits established by special charts, in accordance with the technical documentation for its elements, but at least once a quarter.

Installing fire extinguishing after the replacement of equipment, repair should take place 72 hours in working mode (measures should be provided to measure the response).

It is necessary to follow the rules for the storage, transportation and disposal of the installation elements specified in the operational documents on these elements.

In the protected areas there must be instructions on the action of people working in them in the event of a setup.

In the period in the protected premises of the repair workripens (sprayers, nozzles, heat locks, fire detectors Elements of a cable promotion system) must be protected from plasters, paints, paints, whitewings on them. After the repair of the placement of fixtures, which ensured the protection must be removed.

Faulty rods and nozzles should be replaced with similar products (for example, from the ZIP composition), while their orientation should be kept in space in accordance with the installation project. It is not allowed to install traffic jams or plugs instead of faulty rods or nozzles. It is not allowed to clutter the space in front of the irrigances (nozzles) equipment, lighting devices etc. When conducting, it is necessary to periodically wash (purging) pipelines for removing dirt and rust, as well as test pipelines for strength and tightness.

Do not:

    - use installation pipelines for suspension or attaching any equipment;

    - connect the production equipment and sanitary devices to nutritional (distribution) installation pipelines, install shut-off valves on them (except as provided by the project);

    - Use internal fire cranes for other purposes, besides extinguishing fires.

When performing restoration work paint and varnish coatings Installation elements should be observed installed project identifying colors.

When operating installationsurveral fire extinguishing type of fire load, dimensions and placement of open opening in protected areas must comply with the project. Measures should be taken to eliminate technologically unfounded openings, control the performance of door closers, etc. premises, if necessary, must have good devices (or constantly open openings) to reset the pressure. Changes in the characteristics of the premises that were used as the initial data in the design of the AUP (change in the type of fire load, the size and placement of constantly open openings, etc.), you should agree with the organization-developer of the AUU.

Fire postmust be provided with direct telephone connection with a pumping station (gas fire extinguishing station), as well as urban telephony, good electric lamps.

Periodically, the performance of light and sound alarm on the operation of the fire extinguishing installation and its malfunction should be checked. A 24-hour and permanent duty of personnel should be organized at the fire department. The actions of the duty personnel are negotiated by the instructions when the signals arrive.

Appendix: Forms of operational documents of automatic systems (installations) of fire extinguishing

Download app in Word format \u003e\u003e\u003e please or access this content

Instruction

operating station automatic system

water fire extinguishing

1. The procedure for determining the operation of the installation and the external signaling of technological equipment with automatic and manual start.

2. Modes of operation of technological equipment in standby mode.

3. The procedure for the action of duty personnel in the intercession to duty.

4. The actions of the duty personnel in the fire.

5. The order of the duty personnel when the installation fault signal is received.

1. The procedure for determining performance

installations and external alarms.

1.1. Auto mode

The fire extinguishing installation should work in an automatic mode. At the same time, on the shield of the man, located in the fire department, the lamps of the "Voltage at Intoment No. 1" should be lit, "voltage at introduction No. 2", and all other lamps are not lit. In the control unit (pump) on the shock, all lamps are not lit, the key control keys of the main (No. 1) and the backup (No. 2) of the pumps (on the shch shield) should stand in the "automatic" position

1.2. Manual mode

With regulatory work or at the request of the operation service, the installation can be translated into manual mode, while the "Voltage input voltage No. 1" lamp, "voltage input No. 2", "Disconnect automation pump automation", should be burned on the shield "Turning off the backup pump automatics", in the control unit (pump) on the shra shower key control keys of the main (No. 1) and the backup (No. 2) of the pumps should stand in the "manual" position and burn the "Disable automatic starting pump automatic start" light, "Turning off the automatic start of the backup pump", on the shoe Shu all the other light bulbs are lit.

2. Modes of operation of technological equipment

in standby mode.

Management node (pumping station):

Over entrance door Light burning "fire extinguishing station"

Pressure over the VS-100 valve on the MP No. 1 pressure gauge No. 1 is at least ___ atm.

Pressure in the pneumobank is not lower than ___ atm. on EKM-2

Water level in pneumobacker at 1/2 control glass

Valves No. 1,2,3,4,5,6,7,8 - open

Valves No. 9.10 - closed

Valves No. 1.2 - open

Ventures No. 3.4,5,6,7 - closed

Leaks from the valve, valves should not be

The valves, valves and control keys of the modes must be sealed by printing number 2 "Rubb"

3. The order of the duty officer at

intercession on duty.

The duty officer is obliged:

1. Make a trap and perform an external inspection of equipment and control the instrument readings - "fire post" (duty personnel), "control node (pump)", "Protected premises" (electrician duty).

2. Make sure the light and sound alarm according to claim 1.1 and paragraph 1.2.

3. Ensure in accordance with the operation modes of the technological equipment. (Electrician duty)

4. Check the operation of light and sound alarm: (duty personnel)

A) Press the "Turning Light Alarm" button - all lamps on the shield, except for the reserve.

B) Press the "Turning Signal Fire" button - the "Fire" lamp will turn around and revunts will work.

B) Press the "Turning Signal Turning" button - the "Fault" lamp will light up and makes a call.

5. Make records in the "Journal of Control of the Technical Condition of Fire Extinguishing Installation" Indications of Pressure Gauge No. 1 and ECM No. 2. (Celebration of Electrician) Bypassing to execute at 6.00, 12.00, 18.00, 24.00.

4. The order of the duty personnel in the fire

Automatic sharp

In case of fire in the protective room (damage, the destruction of the sprinkler), the automation and irrigates the fire focus. On the shield is triggered light alarm: "Fire", and turns on Ruong. With a further drop in pressure, EKM No. 2 is triggered and lamps light on the shield: "drop in pressure in a pulse device" and "malfunction", "Start of the working pump" and ring tung and call. If the working pump did not create pressure (defective) automatically starts the backup pump (No. 2) and the lamp "Start of the backup pump" lights up on the shield. It is necessary on the shield of a manner to turn off the sound signals switching togglers.

Manual sharp.

In case of fire in the protective room (damage, the destruction of the sprinkler), the automation and irrigates the fire focus. On the shield, the light alarm is triggered: "Fire" and turns on Ruong. It is necessary to turn off the sound signals in the shield of the shield (duty personnel) to cause a duty electrician.

Running pumps is carried out from the "control node" (pump), when the keys control the pumps (main and backup) modes on the shch shield are translated into the "manual" position. Open valve number 1 under the VP-100 valve. Running the pump is carried out by pressing the "Start" button of one of the pumps. (Electrician duty)

After eliminating the fire.

Translate the control keys of the pump modes in the "control unit" (pump) on the shched panel to the "manual" position, if they were in the "Automatic" position to press the "Stop" buttons of both pumps. Close the valve number 1 under the VS-100 valve. (Electrician duty).

Representatives of a specialized organization should restore the system.

5. The order of the duty officer percognal when

obtaining a "malfunction" signal.

The "Fault" signal appears in the following cases:

Lack of voltage at one of the inputs;

Disabling automation;

Breaking circuits

Decrease or absence of pressure in a pulse tank, while on the shield

the light alarm "Malfunction" is triggered and ringing the bell.

Need:

1. Disable the audio alarm and call the attendant electrician (duty personnel)

2. Report a responsible for the operation of the water fire extinguishing installation, (electrician duty)

3. Make an entry in the "Fault Accounting Journal and Fire Extinguishing Machines and fire alarm", (Electrician duty)

4. Call representatives of the serving organization by phone.

Basic steering document When developing measures for the operation of the ADPS installations are: PPB of RB 1.02-94 "PB Rules for the operation of the technical means of fire protection."

The list of organizational measures primarily includes the development of documentation on the protected facility, which determines the procedure for the operation of the APPU funds, the functional responsibilities of the service and operational personnel, as well as the organization of control over their implementation. The complex of organizational events also includes the development and maintenance of operational documentation for the means of the APPS.

The object must have the following documentation:

project documentation and executive drawings for installation;

act of acceptance and commissioning installation;

passports for equipment and appliances;

statement of mounted equipment, nodes, devices and automation means;

installation instructions;

the list of regulated works on maintenance of installations;

maintenance plan;

magazine of registration of maintenance and repair of installations;

schedule of duty of operational (duty) personnel;

journal of delivery and acceptance of duty of operational personnel;

installation troubleshooting log;

official instructions.

By order of the object manager must be appointed:

the person responsible for operation of the UPA;

service personnel for the production of maintenance of the UPA;

operational (duty personnel)

The person is responsible for operation of the UPA, must provide:

maintaining the UPA in the working condition - making maintenance daily, weekly, monthly, 1 time in 3 months, 1 time in a half, 1 time per year, 1 time in 3.5 years;

control over timely and quality service and planning repairs;

preparation of service and operational personnel and systematic control over the development, maintenance of operational documentation;

informing about cases of work;

General Terms of Technical Content

The conditions of operation of automatic installations of water and foaming should satisfy the requirements of GOST 12.4.009--83, PPB of the Republic of Belarus during the operation of technical means of fire-fighting is sewn, technical conditions Equipment. The operation time of installations is followed by the presence of the required water pressure in the main water holder systems. And also for the presence of the normative reserve of the foaming agent or the solution of the foaming agent in the spare containers of the foam fire extinguishing installations.

In the oil, the air temperature should be at least 5 ° C and not more than 20 ° C.

Floors, stairs and station platforms of fire extinguishing facilities should be kept clean and help. The keys to the station can be on duty personnel.

When caring for automatic waters, it is necessary to monitor the level and purity of water water tank or hydraulic tank.

In areas with a harsh climate, they are monitoring the presence and condition of heating of water and hydropneumatic tanks.

In hydropneumatic installations, he is followed by air pressure in the system and water level. When starting the compressor, you must first make sure of it. During the test tests of the compressor, special attention is paid to the temperature of lubricating oil, bearings and other rubbing compounds.

Due to the high corrosive ability of some types of foaming agents of additional observation in a good condition, a device requires a device for preparing a foaming solution.

After testing the performance, go after extinguishing the fire The dispensing devices of foam fire extinguishing installations is thoroughly washed clean water.

During operation, an inspection of the control panel is constantly being inspected (the status of the relay, starter starters, buttons, switches). Unanized cables. Inserted into small-sized seats, the bottom is protected from mechanical damage. It is monitored by the health of the light and sound alarm on the presence of voltage on the feeders and the disappearance of the voltage on the panels of control circuits and alarm.

Starting devices of fire extinguishing installations are segged and protected from accidental start and mechanical damage.

Each management node hangs plates with the name of the protected rooms, such as the number of rods in the section.

In air systems, air pressure should be 25% water pressure. In water systems, pressure over the control valve (CSC) should not be greater than the pressure under the CCC in the presence of automatic pump 0.05 MPa (0.5 kgf / cm "), in other cases - by 0.03 MPa (0.3 kgf / cm2). Permanently hold the main valve open to the KSK, CGD, taps on the motivating pipeline, taps to pressure gates, the valves of the dosing device (foam plants).

It is not allowed: the use of fire extinguishing plants for suspension or fastening of any equipment: the addition of production equipment and sanitary devices to nutritional pipelines; Installation of shut-off valves and flange compounds on nutrient and distribution pipelines, as well as the use of internal fire cranes installed on the sprinkler network for other purposes, in addition to extinguishing fires. Fire extinguishing installations should be kept clean.

As the main water console, water pipelines are used that ensure the water consumption necessary for fire extinguishing, as well as the risk pumps. If there is an insufficient pressure in the plumbing used to power the sprinkler installation, then the risk pumps are provided. In the pump station, at least two pumps are installed - a working and backup.

The power supply of pumps of pumps is provided from two independent sources. If there is only one power supply, the backup pump drive is provided from the engine internal combustion. manually included. Electrical control of the pumping station is performed in such a way that you can manually turn on the pumps from the pump station. A remote launch is allowed using the buttons installed in the fire post room and near the inner fire cranes.

The pumping station is provided with telephone connection with dispatching point and emergency lighting. At the entrance to the premises of the pumping station post the sign and set the light scoreboard "fire extinguishing station". In the pump station indoors, the blocking stroke diagram of the pumping station and the installation scheme is hung. The room is contained constantly closed on the castle, the keys are at home staff.

Automatic systems of volumetric fire extinguishing having an electrical part and intended to protect the premises with the stay in them are allowed to be put into operation if there is an automatic start-up switching devices on the handmade with the issuance of the corresponding signal to the room attendant personnel; Sound and light fire fighters.

Light alert signal in the form of an inscription on foam light board "and a beep alert must be issued simultaneously within the protected room.

At the same time, the "foam - not to enter" should appear at the entrance to the protected room, and the corresponding signal with information on the supply of fire extinguishing agent should appear.

Automatic fire extinguishing settings, the design of which provides for the presence of a duplicate manual start, should be operated in automatic mode.

Manual starting devices for volumetric (except local) fire extinguishing installations should be located outside the protected room from evacuation outputs with free access to them.

Manual starting devices of local fire extinguishing installations must be out of a possible burning area on a distance safe. At the same time, it is necessary to ensure the possibility of remote inclusion of the installation outside the protected room.

Maintenance of water and foaming installations

The performance of the installations depends on the quality of their operation, especially from the proper maintenance (then). Maintenance of water installations includes a number of events held daily, weekly, monthly, every 3 months, once every 6 months, annually, once every 3 years and once every 3.5 years.

The next operations include the following operations: a) checking cleanliness and order in the fire extinguishing station; b) water level control in the tank using instrumentation; c) external inspection pulse device or pneumatic and control of water level and air pressure (with a decrease in pressure by 0.05 MPa (0.5 kgf / cm)) should be drunk air); d) voltage checking on power inputs; e) external inspection of control nodes and pressure control over and under valve (on pressure gauges); e) access control to control nodes and manual start-up cranes, as well as monitoring compliance minimum distances From the rods to stored materials (which should be at least 0.9 m).

Weekly, the following operations include the following operations:

a) control of fire extinguishing stations: launch of pumps for 10 Checking the health of control and measuring instruments (PPC) and the tightness of the reinforcement and compounds, resume the reserve of lubricant in the oilboxes, testing the compressor at idle, checking the automation of the power on the power transmission from the operating input to the backup ;

b) checking control nodes (cleaning of cranes with a small hole, checking the operation of controls);

c) checking for spare rods in the control cabinet:

d) control of the pipeline system (inspection to detect and eliminate leaks, checking the status of fasteners and painting pipelines. The tightness of the shut-off reinforcement, testing the cranes of manual inclusion);

e) cleaning the rods and wipers from dust in dusty rooms.

The following works are related to monthly:

a) carrying out activities on the weekly then:

b) cleaning the surface of pipelines from dust and dirt:

c) replenishment of tanks with water when lowering the level below the calculated mark:

d) tightening nuts on flange connections Pumps of pumps with pipelines and foundation bolts and other preventive work:

e) checking the health of pneumatic pressure gauges by comparing with the control manometer;

e) Checking the performance of the installation in manual and automatic modes (if there are no specially trained personnel at the facilities).

Then, held every 3 months. Includes:

a) carrying out events on the monthly then;

b) checking internal fire cranes located on the sprinkler network (by opening them);

c) shift pumping pumps pumps:

d) flushing and lubrication of pump bearings:

e) shift compressor seals;

(e) Checking the performance of the installation in manual and automatic modes (if there is specially trained personnel at the facility).

For annual, the following works include: a) Metrological checks of the CAT; b) control of fire extinguishing station equipment (inspection and cleaning of the air boding on the stand; coloring of the outer surface of the pneumatic pulsed device; cleaning, inspection and repair of the compressor and reinforcement; cleaning, repair and painting of the inner and outer surfaces of the tank for filling the pumps: test for the tightness of check valves and valves); c) measuring the impedance and cleaning and repair of control nodes with the replacement of faulty parts, rubber diaphragms and gaskets; d) bulkhead glands of all valves: e) flushing pipelines and changing water in the installation and tank. The insulation resistance of electrical circuits is measured once in 3

goal when holding another annual then.

To the metering time in 3.5 years, it includes work: a) disassembly, cleaning pumps and their reinforcement, detailed inspection of all parts, repair and replacement of faulty: b) hydraulic and pneumatic testing of pipelines; c) purification of reservoirs, repair of the waterproofing layer and receiving valves: d) flushing and cleaning pipelines from dirt and rust with replacement of faulty mounts; e) painting pipelines after rinsing and cleaning.

The specifics of the operation of the Foam Fire Extinguishing Installations (UPP) is determined by the presence of a foaming agent or a foaming solution in the installation tanks, the design of the dosing device and a foam generator (irrigator). The quality of foaming agents and foaming solutions refilled in the UPP are not less frequently 1 times a quarter in accordance with the "instructions for use, storage, transportation and testing the quality of foaming agents"). The foaming agents are considered unsuitable if the values \u200b\u200bof their indicators are 20% lower than the regulatory. Brand foaming agents are written off and use either for training purposes or as wetting additives to water. If the foaming solution or the foaming agent is stored, in the reinforced concrete tank, then at least 1 time in 3 years, the waterproofing layer of the tank is checked and, if necessary, is repaired to avoid leakage of the fire extinguishing agent. In the process of operation, the Armed Forces should pay special attention to the state of foam generators (in particular, grid), containers with a foaming agent and communications for its supply due to the fact that some of the components of the foaming agents have a tendency to crystallization, as a result of which pipe crossings, pipes, Cranes can be clogged. In the process of operation of equipment for sewage tanks with flammable liquids, the state of the sensors for detecting fire (sprinklers or TRV-2 detectors) is also checked, installed in the upper part of the tank, and the foam chamber (especially its sealing shutter).

After working the operations of its communication, the elements are washed with water. Periodic, foam fire extinguishing installations are performed in the same sequence as water fire extinguishing installations. With the exception of next workperformed monthly: in containers where the foaming agent or its solution is stored, check the preservation of seals on observation hatches: if the seals are torn, the foaming agent or the solution is directed to the analysis, and the hatches are again segged; In short, dosing devices (for washing with clean water); Pumps stirred a foaming solution or a foaming agent. Once every 3 years selectively verify the operation of the UPP.

Order of reception of duty

The standing officer from the number of duty personnel is obliged to arrive 15 minutes before the start of duty to the person responsible for the operation of the APPS to instruct.

Replacing duty personnel must: put in order workplace: Fill out the journal of reception and delivery of duty, watch the equipment together with the standing duty.

During the reception of duty, an employee of operational personnel is obliged to adopt office and technical documentation.

Check the performance of telephone with the Ministry of Emergency Situations, other object services.

If troubleshooting is detected, make a mark in the fault accounting log, and communicate responsible for operation, take steps to eliminate.

About changing duty and faults to report responsible for operationCPS.

Actions of operational personnel when triggered control equipment.

During duty, operational staff must follow the technical condition of the UPA.

In cases of workers, AUPT fix it in a journal of work.

With each work, examine the room together with the TB instructors and give conclusion about false positive.

having reworked on official issues, to leave duty energy, indicating its location.

If the fire occurs, operational staff must:

Call divisions of the Ministry of Emergency Situations;

Notify people in the building of people about fire;

Inform the management of the organization about the fire;

Start steaming fire with primary fire extinguishing means.

(If you have an AUPT, check the inclusion of the AUPT, if necessary, turn on manually).

Instructions for service personnel.

Service personnel must:

check the purity and order of the PT station;

conduct an external inspection of the motivating system;

conduct an external inspection of UU and control pressure over and under the valve (not a manometer);

control access to the UU and cranes of manual start, compliance with the minimum distances from the rods to storage materials;

control the health of PT station pumps;

check the health of the UU.

Instruction
About the actions of employees in the premises,
Equipped with automatic installations
Powder (gas) fire extinguishing

1 Before starting work, the employee must:

1.1 Approaching the door, pay attention to the presence or absence of an input door of the cooled signal "Powder (gas) - not to enter!".

1.1.1 The signal is missing - to transfer the installation from the automatic mode to the automation mode is disabled (see the installation instruction manual).
1.1.2 Enter the premises and proceed to work.

1.2 The signal is on - not entitled to the room, immediately report personally or by the tele-background about this, security officers, responsible or duty officer of engineering systems.

2 during operation.

2.1 The first found fire or signs of burning (flame, burning, the smell of Gary) is obliged.
2.1.1 Immediately report on inner telephone A duty officer of the security and in roast protection on the city telephone "01" or "112", indicate the address of the object, the place of the emergence of the fire and report its last name.
2.1.2. Start (if possible) to caring fire with a portable fire extinguisher.
2.1.3 If it is impossible to put out the fire by a portable fire extinguisher - to immediately leave the room.
2.2 If the sound and light alarm "Powder (Gas) - Leave!" The employee is obliged to close the windows, doors and leave the room for no more than 30 seconds.
2.2.1 Ensure that all employees came out of the room.
2.2.2 Tightly close the entrance door.

2.2.3 Tear a seal on the PDP (remote control). Create a fire extinguishing system by running the "Start" button.

3 At the end of the working day, the employee closing the premises must:

3.1 Check if windows are closed; turn the lights off; Exit the room and close the entrance door tightly.
3.2 Translate the installation to "Automatic Mode".
3.3 Make sure the installation has become in "Automatic Mode".

4 Procedure for switching on the installation by a manual detector or with PDP (remote control).

4.1 The first found fire or signs of burning (flame, burning, the smell of Gary) is obliged.
4.2 Check if windows are closed and all workers left the room.
4.3 Exit the room and tightly close the entrance door.

4.4 Pull the manual detector lever (with the button type of the detector - to squeeze the protective glass and press the button) or PDP. After 30 seconds, it will be released to the room of the gas (powder) fire extinguishing composition.

5 Safety requirements.

5.1 Included in the protected room after the fire extinguishing composition and liquidation of the fire in it until the end of the ventilation is allowed only in the insulating means of protecting the respiratory organs.
5.2 Included without insulating respiratory protection tools is allowed only after removing the combustion and decomposition of gas extinguishing composition or sedimentation of powder dust to a safe value.
5.3 Attention! All signals and operations of the operational duty (security service) must be listed in the technical condition of the installation of fire automation with the point of time, the date, F. I. 0. and the signatures. In case of discovery to light, the fire automatics or detection of any malfunction of fire automation de-juroic personnel (security services, dispatcher) must immediately report:
- responsible for exploitation engineering equipment and fire-fighting systems.