Repairs Design Furniture

How to find a brigade of builders to build a house - my experience. Construction orders and applications for apartment repairs without intermediaries! Building brigade to work at the construction site

If you need a brigade builders to build a house, you can hire it at a favorable value now on Youdo.com. Experienced performers will be able to start fulfilling the task immediately after agreeing the conditions of your cooperation or in the agreed period.

The construction of cottages (baths, economic supplies) in the Moscow region ordered by YouDo is carried out according to current engineering standards and technologies. For the future at home, you can choose one of the finished projects or order from the performers by Yuda. Creating a new one. The price of services hired to YouDo.com will be 20-30% lower than the cost of work carried out by profile services in Moscow.

How to order the construction of cottages in the suburbs?

To find on the construction of country houses turn a key and / or attachments around them, create an appropriate task on Youdo. Maximum accurately specify your requirements for the workers you are looking for, and specify them in the application. Further, the conditions of cooperation will be further consistent with the artist found on the Yuda (3D). You set:

  • what types of buildings are required (private residential building, sauna, garden or economic extensions), as well as their number
  • projects of houses of houses
  • when the brigade hired on Youdo should start and finish the construction of a private house, a garden gazebo, etc.
  • the varieties of materials that are needed to build houses from bricks, timber, monolithic panels, etc.
  • price of builders team services, etc.

In the process of arrangement, you can also discuss possible discounts on the construction of cottages in Moscow and the conditions for their receipt.

The cost of builders for Yudu

In the profiles registered on Youdo.com, you can find information on how much it costs a country house from logs or other materials. Prices are indicative and depend on that under what conditions will work work. The final cost of the order depends on:

  • the type of services for which the builder brigade is required to build a house: the construction of a turnkey building or its individual parts (foundation, walls, roofs, etc.)
  • the complexity of the construction of the house (depends on the project, the conditions of the terrain on which the construction site is located, etc.)
  • dIRECTS, allocated for the construction of a house in Moscow

You can significantly save when ordering large volumes of work, as well as long-term cooperation with the selected artist Yud. Free workers on YouDo.com is always, you can order their services around the clock. Hired on Youdo Brigade Builders for the construction of the house will fulfill your task quality, inexpensive and in a short time.

Below I will describe my experience, as I chose builders to build a house of permanent residence.

After reading this instruction, you will receive a complete guide to action and my personal experience about how not to make a mistake when choosing builders and then do not regret lost money, time and nerves.

Immediately I will say that the builders do not like such instructions and a couple of times I wrote at all flattering comments.

At the end of the article I recorded and posted a detailed video, which will give even more answers.

Here are examples of the most popular Russian forums about construction

Many people write there that the builders have spread, they did a bad thing, talked time, did not completely, etc.

Or maybe just people were not there?

Where to looking for

Below I write a list in the order of increasing the likelihood of a successful outcome, that is, at the end more useful options, but read it better, everything would not attack the strange rake.

Familiar through "Sarafan Radio"

The best option is a sarafined radio. If there are friends who built a good house, then let them give you the contacts of builders, but then the problem is right away - you are unlikely to find such acquaintances. Even if someone has built a good house, then the builders will turn out to be rags, whose hands are not growing from that place. I do not consider elite repairs with budgets from 10 million. So we fold this option.

Via the Internet

View 5-10 sites, call 3-5 times, you will be told that the project needs to be able to calculate the cost. And in 99% percent, the project will be made and then calculate the cost. No one will speak with you without a project, and if they are will put in the cost of 200% for the safety net. As a result, spending 2-3 hours wasting you will start looking for other options.

In large companies

It all depends on someone to whom. If the manager is sensible (it is extremely rare, as they work on the salary and the minimum%, there is no motivation), he will be able to pick up you. But again, without the project, the cost will not really count.

on a sheet of paper, sket your Wishlist and pick up the project on the Internet, it will greatly speed up the choice of builders and the definition of the price of construction

In large companies, after the project harmonization, each editing you will be very not cheap. There, so that something to change is needed by multi-stage alignment and it is easier to leave as it is. In addition, they will insert in the contract that the deviation from the project bears an increase in cost, flesh up to 200%.

Through bulletin boards

There are several large sites, I give links to them below.

There are many ads and among them you can find a good brigade for the construction of the house, but consider that you will have to call at least 30-50 ads, and then somehow filter out unscrupulous workers, and there are 99% on announcements sites. They will not value their reputation, constantly change the phones, score from objects to the floor paths and then again are placed under new data.

I found one brigadier through Avito, and a Muscovite. He is a foreman, he has 2 brigades and it works with them himself. But his price tag was higher (the difference was 100 thousand rubles) than the builders of which I found a different place.

Forums

This is the only place where the performers value their reputation.

A large normal forum is only one - House Forum. Here is the link https://www.forumhouse.ru.

Below I will write a detailed instruction as I was looking for. Maybe you can find somehow more, but in my opinion it is the perfect option.

When to start looking

Autumn-Winter, to Marta so that you have already selected a brigade and draws a seat of arrival at the site.

Otherwise, if you start searching in January-February, then God let them be in line for autumn, because in the summer it is painted, but a good special job is never sits. Given that the construction of the house on average occupy 2-3 months, then in the season (when the weather allows) you can make 2-3 homes maximum.

It is not for the season (from the end of autumn and before the beginning of spring) bad, long and mutually.
But significantly cheaper

My builders (who built me) work all year round, but building longer, performance and quality drops strongly, so consider it.

How I was looking for a good brigade for building a house

Search for builders on the website forum house https://www.forumhouse.ru

Immediately I will say that this is not fast, but at the exit you save hundreds of thousands of rubles, and the most important thing is your nerves and time, as you rebuild or search for another brigade on the floor.

Go and register on the stock exchange as a customer https://www.forumhouse.ru/exchange

There entered confirmation by SMS to the phone.

  • Create 3 accounts (not one and not 2, namely 3)
  • Place your order

And create such orders 3 (one with each account - that is, alleged 3 new users make 3 different orders), only you will need 3 different numbers to confirm (for SMS code).

Orders make different and do not create one day, better with a break in 2-3 weeks, which is why:

  1. in order not to suspect that you are the same person.
  2. good specials are constantly on the forum do not sit, but sit, mostly beginners or intermediaries. To catch the specialists, we are broader orders in time.

When creating accounts, use different computers or different browsers (programs through which Sites - Opera, Chrome, Mozilla)

Next, collect applications. Many applications will intersect. With performers on intersecting requests, you can safely bargain and look at how much a person is inferior in price. After receiving at least 20 applications, you will have an understanding of the average price.

I chose from more than 100 sentences and negotiated about the 20th prolabs and brigades. At the exit already chose out of three

This is a full-fledged work, which takes out a few weeks, but she pays off completely

What questions ask.

To understand the builder or not, you will have to delve into the construction technology in any way. Without it in any way.

I will describe the questions on the example of a skeleton house. For other types of houses, you can create a list of themselves.

Questions to builders in frame houses

1. Sequence of the wall of the wall outside (facade, windscreen, insulation, vaporizolation, interior decoration) Many are confused where what film is put

2. Does the ventzor need a skeleton house (definitely yes, if there is no answer, I recommend to immediately cut off such builders)

3. Which side to set vaporizoation - VILLINS inward or outward (outward, as they collect drops and do not give them into the depths of the wall)

4. We want large windows from the floor, will there be a lot of heat through them? (if you say that we will put a good glass and there will be no failure, because any spraying will burn in 2-3 years and through the large windows you will kick in the summer, and in the winter you will get tired of stalling a house)

5. Differs the thickness of the insulation in the walls and the ceiling? (There should be more at least 20-30% in the ceiling. Some make the insulation of the walls 150, and 100 mm rolled insulation is laid in the ceiling and then surprised - where heat is argued)

6. The most important question !!!
Above the carrying capacity of the bar 150 * 150mm or in cholerated thin bars 50 * 150? (if they answer that one thickness is responsible, then immediately refusal, because a single bar of 99% will turn over time, it will fuse and weaken)

After you have chosen suitable for the price and level.

View current objects (departure to houses under construction)

Specify the current or executed objects - see how the situation at the construction site.

What to pay attention to

  • Purity on the site.
    If the working pig, then the house they will be built as well.
  • Compliance with technology
    There are a lot of subtleties, and you better delve into the technology. For example, it is almost always bad to insulate, the insulation is plugged not exactly and then the house is playing in winter. Someone, for example, Minvatu blows under pressure, but in the walls it does not check and not the fact that it is 100% evenly and tightly distributed.
  • Talk to your neighbors.
    Neighbors better than all of all you tell me how the team behaves. Almost always, the neighbors react normally to such questions, and the fact that you consult them with a request almost always add them self-esteem.
  • Take the house of the host's house, which is built and talking to him. If the builders are against, Take this number from the neighbors, and builders minus in karma for distrust and secrecy.
  • Find out the name and name of builders and run them through Yandex for such requests.
    FULL NAME - Reviews
    example of links https://yandex.ru/search/?lr\u003d213&msid\u003d1503892936.11225.22900.15156&text\u003d%D1%81%D1%82%D0%B5%D0%BF%D0%B0%D0%BD%D0%BE % D0% B2% 20% D0% 9C% D0% B8% D1% 85% D0% B0% D0% B8% D0% BB% 20% D0% BA% D1% 80% D0% BE% D0% B2% D0 % BB% D1% 8F% 20% D0% BE% D1% 82% D0% B7% D1% 8B% D0% B2% D1% 8B

Instruct all one company or divide in different contractors.

I divided in different ways. It is cheaper, better, but much flourishing. Considering that I was built the house alone, and the heating and the electrician were sinking other, there were no difficulties, since I had them at the initial stage and they worked together, despite the fact that the project I made up myself and 100% knew what would be.

But usually build a house and only then understand that it was necessary to put the wiring to the floor or water with the sewer plant. But these are already the problems of those who did not make a project or built not according to the drawings and the campaign of the case (and such 95%).

And most importantly - each brigade matures the previous one that they were not so did, and the previous ones had already set off to another object and could redo it only in 2-3 months.

As a result, the question is controversial - how much is better. For example, the heating of specials is little and they work only on themselves, and if your foreman is to connect them and take warranty obligations on yourself, then it will definitely throw 20% (50-100 thousand) to the estimate, and if you agree with them Straight, then in the event of an accident, they can jump, saying that the house is built coryavo.

Council

Enter with all builders in warm trusting relationships, do not bargain if you have already started working and do not regret money (if you say italy's crane for 500 rubles, and not Chinese for 150, then it means so better), in the future it will allow you to get good And the main quick warranty repair.

Treaty

All you will register in the contract an even account will not give you anything. Since you will be sent to him where one of the 1000 will come to the trial, and the most important thing is that the court ruling is still needed to fulfill, and the bailiffs accurately do nothing more as your 200,000 knock out from the workers, whose and at home there is no one.

Therefore, I am writing an instruction on what to pay attention to the agreement with the brigade, a progress in good dialogue and subtly hint that if the tightening is, the payment will be proportionally cut off. But it is better to register everything on paper in the form (no will be superfluous)

1. Duration

The deadlines for the start of construction, the deadlines for the end of each stage (I paid in stages, but then how to agree), the deadlines for the delivery of the object.

Final amount. But there is such a moment, the root for example, it is difficult to calculate 100%, as well as the area of \u200b\u200bthe facade or the number of insulation (I counted in the architecture, my error was 2-3%, but still on the money then 20-30 thousand). Therefore, it is better to discuss the cost of materials and if it is not enough to buy, than to register a fixed amount and builders will buy with a reserve and residue will leave themselves.

3. Warranty

The warranty extends more to engineering systems, as the house, if they built correctly (and we chose exactly the right builders), then nothing happens to him.

In any case, write that if something breaks, the contractor (performer) undertakes to eliminate the malfunction within 2 days. Since if the pump or boiler is flying, then without water and heat you oak give quickly.

Video

conclusions

1. Before starting to select builders, decide what you want (sketch the project, select the appearance of the house).

2. Look for builders from familiar or forums, that is, where people value their reputation.

3. Call 30-50 builders / companies, communicate, specify the fineness of the technology, be meticulous.

4. Specify the objects under construction in order to verify whether the construction technology is fully complied with the place of the site.

5. Reasonly trample and choose from those proposals that you like. Do not knock down the price, since then you will regret it yourself (they will be saved on you, and Krailovo, as you know, leads to the fall).

7. Conclude a contract in which you clearly register the deadlines (if you do not execute, then register) as well as warranty conditions (if something breaks, to come and eliminate the breakdown within 1-2 days).

You can spend 2-4 weeks to call, search for bulletin board, reading forums where disgruntled tens of thousands.

Or you can write to me, I will advise you how it is better to do, I will give the contacts of the builders who built me \u200b\u200ba house, as well as help to avoid all the mistakes that I allowed.

Need electrician to complete electrical work. Object children's clinic. Located in Shushary. Complete the cable laying without sticking. Installing outlets and switches about 30 pcs. Installing lamps in Armstrong 44pcs. Collect shield. Payment in stages. Call until 20.00

Geographically shushary

10.29.2019 Customer

A brigade is required 10-15 people for the device GLC - walls in one layer - 1000kv.m. / 280r. - Partitions in two layers - 550kv. / 410r. - Ceilings in one layer - 450kv. / 430r. The tool is issued, the material is issued. Payment piece.

Geographically St. Petersburg

10.29.2019 Customer

Requirements are required for redecorating apartments in Kaluga. Walls put spa, primer, wallpaper-186r.m2. Floors in the San Nodes of the corridor and kitchens tile-300r.m2. Tile on the walls-380r.m2. Laminate on the floor 135r.m2. Installation of the assembled door 500r. Box from GLK-265P.M2. Stroke plaster 8T.R Floor. Installation of plinth of outdoor 22r.m.p. Speaks under painting. 130r.m2. We are 13 floors of 5 apartments on the floor. 2 apartment 3-room and 3 one-bedrooms. Dates until March 1. Payment every 2 weeks by any ways. Need a brigade at least 15 people.

Territorial Kaluga

10.29.2019 Customer

Wanted painters, painting walls and ceilings, consider exclusively those who are ready to leave and paint. Accommodation in place is possible, a day from 2500 rubles

Geographically Moscow

10.29.2019 Customer

It is necessary to repair the room 140-150 sq m in Moscow. We open in the ceiling with a device of a monolithic staircase, a tile on the staircase and the floor, the plaster of the walls, the device of partitions from puzzle plates with a total area of \u200b\u200b126 sq m, electrician, painting the ceiling in black and suspended ceiling, toilet arrangement 4 sq m, laying tiles on the service entrance . Perhaps accommodation at the facility. The total cost of work without materials is 350000 rubles.

Geographically Moscow

10.29.2019 Customer

It is necessary to change the introductory cables in the apartment. Required cable broach and pipe mounting. Punching holes in the apartment, mounting the cable channel. Sick all electricians with tolerance. Accommodation in a rented apartment.

Territorial Kirishi, Volkhovskaya 6

10.28.2019 Customer

Looking for a brigade for overhaul in the room. Total 320 sq.m. (15 rooms + hoz. Premises). List of basic works: Alteration of interconnection. foam block partitions - 30 sq.m; plaster and painting work - 1000 sq. M.; Wall tile 200 sq.m.; Floor tile 140 sq. M.; laminate 170 sq.m.; suspended or stretch ceilings 320 sq. M.; Construction of concrete ladies in 5 steps and mezzanine 3kv.m. Installation of doors, plinths, window sills, repair of window slopes, installation of Santeh.Priborov (17 bathrooms) - the whole complex of repair work, with the exception of screed, electrical and plumbing communications. The beginning of work - in the coming days. Without intermediaries and advances! Payment phased, cash in hand workers!

Geographically Moscow, Aviamotornaya Street

Now many believe that the builders brigade is very simple. The range of firms allows you to think so. But in practice the customer faces a number of difficulties. And despite numerous advice on the choice of specialists, prefers not enough to qualified employees. Construction and repair work is now expensive, do you need to pay twice? After all, not only self-taught builders are to blame for bad work, but also customers who negligently reacted to the selection of the brigade. On our site you can find a brigade using the selection of verified specialists.

  • Find out about the brigade thanks to the announcement at the stop.
  • The company proposed a very low cost.
  • The construction and repair work project was not provided.

The first error of the customer - the negligence attitude to the search


First, consider the first item. It is possible to find builders very quickly, but why is such a hurry? After all, you can get caught on the bait of scammers. If there is a desire to find a truly reliable company, the search is better to start as soon as possible, at least for half a year. It is worth noting that professionals are always loaded by work in the construction and repair season. Therefore, the customer should surprise that everything is sitting in the firm in the summer without being waiting for a new order. Only in advance by agreement with the administration of the company, you can expect that in the summer without a queue at the right time will begin active work.

A good brigade schedule can be painted even six months ahead, and you should not forget about it.

Regular orders for brigades builders who really have excellent qualifications are the norm.

The second customer error is the search for the cheapest rates. Construction firms with an excellent reputation, of course, can offer their customers attractive discounts. But at the same time prices will not be very different. If the builders brigade for their services ask for a very low payment, it is necessary to think seriously. Free cheese only happens in a mousetrap. Therefore, it is not necessary to cooperate with dubious companies that are trying to lure customers in low prices.

The third reason is no clear plan. If the Customer begins to cooperate with the construction company, and it does not provide a project of the upcoming construction work, it means that you need to think seriously. The presence of drawings is a mandatory component, without it, the processes for the arrangement of the room will not begin. In the company should offer not only their own options, but also listen to the customer, take into account his wishes and of course, if necessary, to make edits to the project. Previewing the sketch, the customer will be able to avoid unpleasant situations that may arise at the end of all works. In order to avoid disagreements, you need to get acquainted with the drawings and make edits if they are necessary.

How to find operational

There are various situations, so many have a question, is it possible to find qualified workers in principle? Naturally, there is practically no chance of starting cooperation with the best market players. However, still there are several ways to find the appropriate option as quickly as possible.

First, to search for the brigade it is better to use specialized sites, the so-called construction exchanges, where construction companies offer their services. For example, the site http://stroiman.ru/, here you can choose the construction team in almost any region.

Secondly, you need to get acquainted with the site of the construction company. Going to the resource, you are not only sketches, which are presented as an example, but also photos that illustrate the entire process of building at home. By the way, if there are builders in the pictures that will work on a customer's project - this is a real luck. After all, now on sites, you can rarely find photos of workers, projects will often present models.

Acquainting projects, it is important to view work and in order to assess the level of complexity of the processes performed. For example, if the company is engaged only by the repair of apartments, will employees be able to cope with the construction of a cottage in this firm? Even if the manager will assume that the Brigade will be able to cope with all the processes at the proper level, it is not worth trusting him. If there are no examples of the work already performed, it means that there can be no confidence that the result will justify expectations.

Thirdly, in order to determine the charges underestimated whether the cost is offered in a construction company, it is worth talking on a specialized forum. Many community participants have already built a house or made repairs and are not lynching to share their impressions.

And, fourth, the construction company can already exist for a long time on the market, but at the same time have in the staff of employees without work experience. For example, if the number of orders increases, you need to create new brigades - no one wants to lose money. Therefore, the customer has the right to view the brigade's portfolio of each employee and make sure that the work will be treated in case of cooperation.

It is easy to find builders brigade, however, in order to not be disappointed in the work of specialists, it is necessary to competently treat the company's choice and follow ordinary advice.

Below I will describe my experience, as I chose builders to build a house of permanent residence.

After reading this instruction, you will receive a complete guide to action and my personal experience about how not to make a mistake when choosing builders and then do not regret lost money, time and nerves.

Immediately I will say that the builders do not like such instructions and a couple of times I wrote at all flattering comments.

At the end of the article I recorded and posted a detailed video, which will give even more answers.

Here are examples of the most popular Russian forums about construction

Many people write there that the builders have spread, they did a bad thing, talked time, did not completely, etc.

Or maybe just people were not there?

Where to looking for

Below I write a list in the order of increasing the likelihood of a successful outcome, that is, at the end more useful options, but read it better, everything would not attack the strange rake.

Familiar through "Sarafan Radio"

The best option is a sarafined radio. If there are friends who built a good house, then let them give you the contacts of builders, but then the problem is right away - you are unlikely to find such acquaintances. Even if someone has built a good house, then the builders will turn out to be rags, whose hands are not growing from that place. I do not consider elite repairs with budgets from 10 million. So we fold this option.

Via the Internet

View 5-10 sites, call 3-5 times, you will be told that the project needs to be able to calculate the cost. And in 99% percent, the project will be made and then calculate the cost. No one will speak with you without a project, and if they are will put in the cost of 200% for the safety net. As a result, spending 2-3 hours wasting you will start looking for other options.

In large companies

It all depends on someone to whom. If the manager is sensible (it is extremely rare, as they work on the salary and the minimum%, there is no motivation), he will be able to pick up you. But again, without the project, the cost will not really count.

on a sheet of paper, sket your Wishlist and pick up the project on the Internet, it will greatly speed up the choice of builders and the definition of the price of construction

In large companies, after the project harmonization, each editing you will be very not cheap. There, so that something to change is needed by multi-stage alignment and it is easier to leave as it is. In addition, they will insert in the contract that the deviation from the project bears an increase in cost, flesh up to 200%.

Through bulletin boards

There are several large sites, I give links to them below.

There are many ads and among them you can find a good brigade for the construction of the house, but consider that you will have to call at least 30-50 ads, and then somehow filter out unscrupulous workers, and there are 99% on announcements sites. They will not value their reputation, constantly change the phones, score from objects to the floor paths and then again are placed under new data.

I found one brigadier through Avito, and a Muscovite. He is a foreman, he has 2 brigades and it works with them himself. But his price tag was higher (the difference was 100 thousand rubles) than the builders of which I found a different place.

Forums

This is the only place where the performers value their reputation.

A large normal forum is only one - House Forum. Here is the link https://www.forumhouse.ru.

Below I will write a detailed instruction as I was looking for. Maybe you can find somehow more, but in my opinion it is the perfect option.

When to start looking

Autumn-Winter, to Marta so that you have already selected a brigade and draws a seat of arrival at the site.

Otherwise, if you start searching in January-February, then God let them be in line for autumn, because in the summer it is painted, but a good special job is never sits. Given that the construction of the house on average occupy 2-3 months, then in the season (when the weather allows) you can make 2-3 homes maximum.

It is not for the season (from the end of autumn and before the beginning of spring) bad, long and mutually.
But significantly cheaper

My builders (who built me) work all year round, but building longer, performance and quality drops strongly, so consider it.

How I was looking for a good brigade for building a house

Search for builders on the website forum house https://www.forumhouse.ru

Immediately I will say that this is not fast, but at the exit you save hundreds of thousands of rubles, and the most important thing is your nerves and time, as you rebuild or search for another brigade on the floor.

Go and register on the stock exchange as a customer https://www.forumhouse.ru/exchange

There entered confirmation by SMS to the phone.

  • Create 3 accounts (not one and not 2, namely 3)
  • Place your order

And create such orders 3 (one with each account - that is, alleged 3 new users make 3 different orders), only you will need 3 different numbers to confirm (for SMS code).

Orders make different and do not create one day, better with a break in 2-3 weeks, which is why:

  1. in order not to suspect that you are the same person.
  2. good specials are constantly on the forum do not sit, but sit, mostly beginners or intermediaries. To catch the specialists, we are broader orders in time.

When creating accounts, use different computers or different browsers (programs through which Sites - Opera, Chrome, Mozilla)

Next, collect applications. Many applications will intersect. With performers on intersecting requests, you can safely bargain and look at how much a person is inferior in price. After receiving at least 20 applications, you will have an understanding of the average price.

I chose from more than 100 sentences and negotiated about the 20th prolabs and brigades. At the exit already chose out of three

This is a full-fledged work, which takes out a few weeks, but she pays off completely

What questions ask.

To understand the builder or not, you will have to delve into the construction technology in any way. Without it in any way.

I will describe the questions on the example of a skeleton house. For other types of houses, you can create a list of themselves.

Questions to builders in frame houses

1. Sequence of the wall of the wall outside (facade, windscreen, insulation, vaporizolation, interior decoration) Many are confused where what film is put

2. Does the ventzor need a skeleton house (definitely yes, if there is no answer, I recommend to immediately cut off such builders)

3. Which side to set vaporizoation - VILLINS inward or outward (outward, as they collect drops and do not give them into the depths of the wall)

4. We want large windows from the floor, will there be a lot of heat through them? (if you say that we will put a good glass and there will be no failure, because any spraying will burn in 2-3 years and through the large windows you will kick in the summer, and in the winter you will get tired of stalling a house)

5. Differs the thickness of the insulation in the walls and the ceiling? (There should be more at least 20-30% in the ceiling. Some make the insulation of the walls 150, and 100 mm rolled insulation is laid in the ceiling and then surprised - where heat is argued)

6. The most important question !!!
Above the carrying capacity of the bar 150 * 150mm or in cholerated thin bars 50 * 150? (if they answer that one thickness is responsible, then immediately refusal, because a single bar of 99% will turn over time, it will fuse and weaken)

After you have chosen suitable for the price and level.

View current objects (departure to houses under construction)

Specify the current or executed objects - see how the situation at the construction site.

What to pay attention to

  • Purity on the site.
    If the working pig, then the house they will be built as well.
  • Compliance with technology
    There are a lot of subtleties, and you better delve into the technology. For example, it is almost always bad to insulate, the insulation is plugged not exactly and then the house is playing in winter. Someone, for example, Minvatu blows under pressure, but in the walls it does not check and not the fact that it is 100% evenly and tightly distributed.
  • Talk to your neighbors.
    Neighbors better than all of all you tell me how the team behaves. Almost always, the neighbors react normally to such questions, and the fact that you consult them with a request almost always add them self-esteem.
  • Take the house of the host's house, which is built and talking to him. If the builders are against, Take this number from the neighbors, and builders minus in karma for distrust and secrecy.
  • Find out the name and name of builders and run them through Yandex for such requests.
    FULL NAME - Reviews
    example of links https://yandex.ru/search/?lr\u003d213&msid\u003d1503892936.11225.22900.15156&text\u003d%D1%81%D1%82%D0%B5%D0%BF%D0%B0%D0%BD%D0%BE % D0% B2% 20% D0% 9C% D0% B8% D1% 85% D0% B0% D0% B8% D0% BB% 20% D0% BA% D1% 80% D0% BE% D0% B2% D0 % BB% D1% 8F% 20% D0% BE% D1% 82% D0% B7% D1% 8B% D0% B2% D1% 8B

Instruct all one company or divide in different contractors.

I divided in different ways. It is cheaper, better, but much flourishing. Considering that I was built the house alone, and the heating and the electrician were sinking other, there were no difficulties, since I had them at the initial stage and they worked together, despite the fact that the project I made up myself and 100% knew what would be.

But usually build a house and only then understand that it was necessary to put the wiring to the floor or water with the sewer plant. But these are already the problems of those who did not make a project or built not according to the drawings and the campaign of the case (and such 95%).

And most importantly - each brigade matures the previous one that they were not so did, and the previous ones had already set off to another object and could redo it only in 2-3 months.

As a result, the question is controversial - how much is better. For example, the heating of specials is little and they work only on themselves, and if your foreman is to connect them and take warranty obligations on yourself, then it will definitely throw 20% (50-100 thousand) to the estimate, and if you agree with them Straight, then in the event of an accident, they can jump, saying that the house is built coryavo.

Council

Enter with all builders in warm trusting relationships, do not bargain if you have already started working and do not regret money (if you say italy's crane for 500 rubles, and not Chinese for 150, then it means so better), in the future it will allow you to get good And the main quick warranty repair.

Treaty

All you will register in the contract an even account will not give you anything. Since you will be sent to him where one of the 1000 will come to the trial, and the most important thing is that the court ruling is still needed to fulfill, and the bailiffs accurately do nothing more as your 200,000 knock out from the workers, whose and at home there is no one.

Therefore, I am writing an instruction on what to pay attention to the agreement with the brigade, a progress in good dialogue and subtly hint that if the tightening is, the payment will be proportionally cut off. But it is better to register everything on paper in the form (no will be superfluous)

1. Duration

The deadlines for the start of construction, the deadlines for the end of each stage (I paid in stages, but then how to agree), the deadlines for the delivery of the object.

Final amount. But there is such a moment, the root for example, it is difficult to calculate 100%, as well as the area of \u200b\u200bthe facade or the number of insulation (I counted in the architecture, my error was 2-3%, but still on the money then 20-30 thousand). Therefore, it is better to discuss the cost of materials and if it is not enough to buy, than to register a fixed amount and builders will buy with a reserve and residue will leave themselves.

3. Warranty

The warranty extends more to engineering systems, as the house, if they built correctly (and we chose exactly the right builders), then nothing happens to him.

In any case, write that if something breaks, the contractor (performer) undertakes to eliminate the malfunction within 2 days. Since if the pump or boiler is flying, then without water and heat you oak give quickly.

Video

conclusions

1. Before starting to select builders, decide what you want (sketch the project, select the appearance of the house).

2. Look for builders from familiar or forums, that is, where people value their reputation.

3. Call 30-50 builders / companies, communicate, specify the fineness of the technology, be meticulous.

4. Specify the objects under construction in order to verify whether the construction technology is fully complied with the place of the site.

5. Reasonly trample and choose from those proposals that you like. Do not knock down the price, since then you will regret it yourself (they will be saved on you, and Krailovo, as you know, leads to the fall).

7. Conclude a contract in which you clearly register the deadlines (if you do not execute, then register) as well as warranty conditions (if something breaks, to come and eliminate the breakdown within 1-2 days).

You can spend 2-4 weeks to call, search for bulletin board, reading forums where disgruntled tens of thousands.

Or you can write to me, I will advise you how it is better to do, I will give the contacts of the builders who built me \u200b\u200ba house, as well as help to avoid all the mistakes that I allowed.