Repairs Design Furniture

Projects of single-storey skew houses with a terrace. Projects of frame houses with terrace Frame panel house with terrace

The countryside house with a terrace built by professionals, in terms of comfort, is no longer inferior to elite cottages, for the construction of whose years. But this building is being built in a few weeks, while the customer is delivered from a number of problems that accompany new buildings from concrete or bricks.

We build frame houses with a terrace and a turnkey veranda: you can see examples of structures in the photo in the catalog, there are projects here, there are approximate prices for construction. Place the order - you will soon have your own comfortable country house!

Benefits

  • Easy and fast construction technology;
  • Reliability and durability, not inferior to houses built by the "traditional" way;
  • The relatively small mass (and therefore is the absence of shrinkage) and stability.

Country house with a spacious open platform, which in the warm season is used as a summer dining room or a resting place - the subject of dreams of many. In winter, due to the presence of a terrace or veranda in the house, heat loss is reduced, which contributes to some savings on heating.

The optimal form of the terrace is rectangular. The extension size depends on what the customer plans to use it.

  1. If guests in summer days are gathering on the terrace, it should be done by spacious.
  2. If the terrace will serve as an ornament, the element of the cozy environment and perform the function of the porch or veranda, enough and a small area.
  3. The terrace should be located on the sunny side so that sunlight falls as much as possible during the day.
  4. Access: Well, if you can go to it from the living room or kitchen. It is convenient for cases when guests are in the house: do not have to walk far to bring products.

The terraces are open and closed. If the first are suitable for recreation solely in the warmth time, then the second is glazed and insulated - can be used for friendly and family gatherings throughout the year. A frame house with a terrace is an opportunity to acquire your own excellent place to relax in the very near future.

The terrace is a specially equipped area, intended for recreation or entertainment. The main difference between the terrace from the veranda lies in the fact that the veranda is always attached to the house and can be equipped for permanent residence.

In turn, the terrace can adjoin the cottage, and maybe part of the landscape design or connect the main building and pool or bath.

What are the terraces?

Terrace projects are traditionally divided into two types:

  • Open.

They have only a roof and the bottom of the walls (approximately a meter height). The roof of such a terrace is created separately from the main house. It holds on special support beams. Such an extension is used as a gazebo or as a place for cooking on an open flame. It is much more practical than the gazebo in the garden and gives the house a certain charm.

  • Closed.

This is an open terrace in which free opening glazed. It turns out a single space where a large amount of sunlight penetrates. This allows you to use an extension even in rainy weather or with strong wind. However, there is no insulation in it. Therefore, use is limited to late spring and summer.

A competently designed extension is harmonized with single-storey cottages 6x6, endowing them with additional functionality.

What construction materials should be used?

Frame houses with a terrace require the use of special building materials. This extension is not sealed and needs special care.

There are materials specifically designed for service outdoors. Gearboards coated on top of the polymer composition are used. It protects wood from rotting, which allows you to effectively resist the rain and snow.

The extension frame must be impregnated with a special solution from mold, black rot, insects. Each spring should be inspected by the state of materials. In this case, it will have to carry out planned repairs. If you tighten with the service, the extension will quickly lose strength and starts to collapse.

Build a country house on a framework technology plus a small veranda. According to the cost, it turned out quite economically, and in terms of 3 and a half months. Finished even for a couple of weeks earlier promised. We go to the cottage only in the summer, so I can't say anything about the thermal insulation. Thank you

Thank you so much for the built house from aerated concrete. Quality and material and work are excellent - friends are jealous. The deadlines of the work performed - about 4.5 months on an empty place built house. Good luck to all of you, good customers and large houses !!


We were built a house for 3 months (they started the foundation at the end of the summer, and the walls and interior finish ended in the fall), it was not cheap, but everything was thought out, our participation was minimal. This year we build a bath with them! Thank you for such professional guys that you provided us!


Thank you so much for work and attitude! Everything is prompt, high quality, quickly! Thanks by the brigade under the leadership of Alexey!


My company built an excellent summer house! There are no complaints about what I do not have any, in the next summer I am going to build a bath and a garage to contact them. Thanks to all especially the Sergey's brigade, which built me, much depends on them!


They built a house of aerated concrete in your company - I am very pleased. Our pre-prepared foundation was put in 45 days. And as a gift received insurance at home for a year. So -Classify.


In August 2017, he ordered the foundation (monolithic plate) under the house in the Leningrad region. In 2018, the house itself has already ordered. I can recommend, because The result was satisfied. Everything quickly and professionally performed.


Ordered in the summer of 2016 house and garage in this company. The builders worked for about a month 4, without a break (really liked). Everything was done according to the contract, no extra money asked.


Frequent questions before construction

About company

How long has your company work?

Our company began work as another repair and finishing in 2007. Since then, we have grown up to the standard sphere and all thanks to our employees. Separate thanks for invested labor in the development of Okmpania.

What is confirmed by the competence of specialists?

All architects and engineers companies have qualifying certificates. Because under the project is not a license of the company, but the architect certificate. By law, the responsibility for the project lies with the architect.

Does your company perform your company? Or attract contractors?

  • We ourselves we carry out general construction, finishing works, a device of a plot, engineering system layout (electricity, home heating, water supply) and so on.
  • Contractors We invite you to work that we do not fulfill every day and require specialization, for example: production and installation of windows and doors (special marking), air conditioning systems, boiler equipment, installation of wells, septics.
  • Search, attraction, compliance with the agreements and monitoring the execution of work by contractors is our task.
  • 80% of all works on the construction of your home we carry out on our own and only 20% - attract contractors.
  • With each Contractor, we conclude an agreement in which he indicates a guarantee for their work performed, and in case of malfunctions, their elimination lies on the contractor.

Can I see objects that are now in work?

Yes, there are objects that we can show at different stages of work and already paid houses by prior arrangement.

about the project

Typical project to buy or order individual?

Buy a finished project.

  • Plus is the price.
  • Minus - It will not provide all your wishes about materials and layouts. Also, it will require refinement under the features of your site.

Buy a finished project and modify it.

It all depends on the changes you want to make. This option is possible that it will be more profitable to develop an individual project than to refine type.

The cost of such improvements must be discussed at the meeting.

Development of an individual project of the house.

  • Pros: All your wishes are taken into account regarding all the characteristics of the house and the site.
  • Minus - the cost of such a project is higher than typical.

BUT! You can develop an individual project for free. If our company is building, then the development of an individual project for you is free.

How does an individual project work?

  • The development of an individual project begins with the signing of the contract and the first meeting with the architects, at which the client voices his wishes. According to the meeting, the design task is issued, which is an attachment to the contract.
  • Architects prepare several sketches options and are determined with the client in which direction to move on. For the entire design period there are several meetings with the client, on which all architectural and design solutions are being studied in detail before the client will arrange everything that he confirms the signature on a draft design.
  • Next is being developed working project. This is the settlement stage of each design solution on which the client is not involved.
  • All this process takes from 2 weeks to 2 months, after which the client receives a ready-made project with ready-made detailed miscalculations, which is necessary when submitting documents for obtaining a construction permit.

About construction

Will you go to the site where construction is planned?

Yes. When examining the site, we take into account the size, check-in from the road and its width, the proximity of the development of neighbors, the presence of a slope or differential, the side of the world and what kind of ground in the area.

Do you help you choose a site for construction?

Yes. Our specialists help with the selection of the site. Will help find it on your requirements on the Internet with advertisements.

What affects the final price of the house?

The cost of building a house affects:

  • plot features: relief, deposit conditions, location
  • materials used in working
  • features of architecture at home
  • conditions for the production of work (time limits)

What guarantees do you give?

Our work we give a guarantee of 3 years. The manufacturer gives the guarantee and it is different in each case. There are materials to which the manufacturer gives an indefinite guarantee.

How can I control the construction?

  • Each client we send a phased photo of the work report.
  • We install online video monitoring of the object 24h per day, access to you and the company's specialists (service is paid).
  • You can also use the services of companies that carry out technical control.
  • The construction is in phased surrender, you always see what stage and only after accepting one - we proceed to the following.

When is the contract sign?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the development and approval of the estimates.

When should I pay for your work?

According to the design, the advance payment is made within 5 days after signing an agreement in the amount of 70% of the total amount. The residue is paid when transferring the finished project to the client.

Payment of construction is divided according to the steps that are written in the estimate. Each stage of construction is also divided into payments, the size of which can be different (is usually associated with the need for procurement of materials)

How is the placement of builders?

  1. It will be convenient if you have the opportunity to place builders next to the construction site, a garden house, a building trailer, an old house or any other building with a roof.
  2. If nothing like this is, then we will be ready to bring our household for free.
  3. In extreme cases, we will place our builders in the nearby hostel

What communications are needed to start construction: light, water?

Electricity with no less than 5kW and technical water.

If this is not, we will bring our generators for free. Water in most cases, with wooden construction, use only for household needs, we will ensure its delivery.

What time of year do you build construction?

We build all year round, one of the important conditions in the spring-autumn period is a suitable road for the entrance of the vehicle.

What can we do for you?

We will help you to save, correctly calculating the estimate and choosing high-quality materials.

Perform high-quality project documentation, thanks to which you can do not worry about the constructive solutions.

We work throughout the Moscow region

Volokolamsky district, Voskresensky district, Dmitrovsky district, Yegoryevsky district, Zarayski rn, Istrinsky rn, Kashirsky district, Klinnj district, Kolomna district, Krasnogorsk, Rn, Leninsky district, Lotoshinsky district, Lukhovitsky district, Lyubertsy district, Mozhaisky district, Mytishchinsky district, Naro-Fominsky district, Noginsky district, Odintsovsky district, Ozersky R- N, Orekhovo-Zuevsky district, Pavlovo-Posadsky district, Podolsky district, Pushkinsky district, Ramensky district, Ruzsky district, Sergiev Posad district, Serebryano-Pond, Rn, Serpukhovsky Rn, Solnechnogorsk district, Stupinsky district, Taldomsky district, Chekhovsky district, Shatursky district, Shakhovskaya district, Schelkovsky district.

Especially attractive such projects with limited area area in the vicinity of Moscow and the considerable price level for them. The terrace or veranda with access to the garden or on beautiful flower beds serve as a transitional link and connect the comfort of the house with the pretters of landscape design.

It is the framework technology that gives special freedom to form a transition from the interior to the landscape and saves on the construction as a whole. The main advantages that the frame house with the terrace posses is:

  • savings on the foundation, which is cheap due to a small load on it;
  • the possibility of building a turnkey house for one season;
  • projects of such houses initially provide for effective thermal insulation;
  • construction does not require the use of heavy machinery and large materials.

Exactly the same advantages have a frame house with a veranda. The difference between them is the greater protection of the "intermediate" platform from bad weather. At the same time, it is possible to order construction with removable or sliding window frames, so that the veranda can quickly turn the terrace and vice versa.

House with a terrace from "SK-Posad"

The construction company "SK-Posad", located in the city of Pestovo, offers design and construction in the Moscow region frame houses of various configurations and squares. In the company you can buy ready-made projects, the initial choice of which is convenient thanks to the photo on the site, or order the project development of an individual set of requirements, with reference to a specific landscape. In any case, the customer will be presented with a flawlessly performed set of project documentation, and the construction of their business will take construction.

Frame houses with a terrace from the company "Choice" enjoy among country housing lovers unchanged demand and great popularity. High quality, compliance with technologies, three-year warranty, delivery and installation of up to 450 km from the city of Pestovo Novgorod region is free. Experience for 10 years and the availability of only Russian masters make the company one of the leaders in this segment of the construction market. The attentive attitude of the company's specialists to the wishes of potential customers makes it possible to build a beautiful and cozy house on the sketches of the customer.

Characteristics

Frame houses with a terrace are characterized by high speed and simplicity of construction, excellent thermal insulation and hydraulic protection properties, low cost due to the absence of the foundation and unnecessaryness of the use of severe construction equipment. The presence of a terrace gives a large space for the realization of various ideas for the arrangement of the useful area. It is possible to create a gazebo for rest, breaking a small flower garden or organizing a children's corner. Frame houses with a terrace are distinguished by high attractiveness and harmoniously complement the natural landscape.

To hand over the owner of a skeleton house with a terrace from the company "Choice" is not difficult. You should call the phone or leave an application on the site, agree on the project, conclude an agreement, pay 70% of the cost when delivering the first materials and then enjoy all the advantages of new and comfortable housing.